Rules & Permits

How many bedrooms is my Davidson County septic approved for?

Metro holds the record and will tell you. It affects what you can advertise, what you can add, and how often you should pump.

Metro Public Health holds this record for existing residences in Davidson County and will provide the approval date, inspection dates and the number of bedrooms the system is approved for. Contact Environmental Engineering Services on 615-340-5604 with the property's map and parcel number.

Published August 31, 2026 · Last updated August 31, 2026 · By 615 Septic Tank Pumping

Where to get the number

Metro Public Health’s Septic and Sewage Disposal Systems division holds it. Their published services include a “How Many Bedrooms?” request, which returns the approval date, inspection dates, and the number of bedrooms an existing residence is approved for.

You will need the property’s map and parcel number or tax ID. If you do not have it, Metro’s online property information will give it to you.

Environmental Engineering Services: 615-340-5604.

That division also handles soils interpretation, system design, percolation-test monitoring and groundwater protection for the county, which is why the records sit with them.

Why the number matters

It is not a bureaucratic detail. Four things follow from it.

1. It is the system’s design capacity

Septic systems are sized by bedroom count, which is used as a proxy for daily wastewater flow. A three-bedroom approval means the tank capacity and drain field area were calculated for the flow a three-bedroom household is assumed to produce. Exceed it consistently and you are running the system above design — which shortens the field’s life regardless of how diligently you pump.

2. Advertising above it is unlawful

In Tennessee it is illegal to advertise a home for more bedrooms than its septic is approved for, and the person advertising it is liable for misrepresentation. This bites hardest at sale, and it is one of the more common problems found during real-estate septic inspections.

3. It affects short-term letting

Nashville has a very large short-term rental market, and a listing that sleeps ten in a house approved for three bedrooms is loading the system at several times its design flow on a peak weekend. The advertising rule is written about advertising, and a short-term rental listing is advertising. Worth knowing your number before you list.

4. It should inform your pumping interval

If the household exceeds what the system was permitted for, the standard three-to-five-year interval does not apply to you. The right interval is capacity against actual flow, measured.

Before you extend

If you are adding a bedroom, converting an attic or finishing a basement with sleeping space, check the approval first. Adding capacity to a house without adding capacity to the system is how a working field gets destroyed in a few years, and increasing the approved count requires permitting, a site evaluation including a soil morphology assessment by a soil scientist, and sufficient suitable area on the parcel.

While you are checking, ask about the reserve area too. Tennessee requires the system to sit entirely within its own parcel with setbacks, and requires the parcel to retain enough room to replace the system should it fail.

What to do with the answer

SituationWhat it means
Bedrooms match the approvalStandard intervals apply; keep the record for a future sale
House has more bedrooms than approvedGet advice before listing or letting; shorten your pumping interval now
Planning to add a bedroomCheck whether the system can be upgraded before committing
Letting short-termCompare the approval against your listing’s sleeping capacity

Bottom line

Call Metro on 615-340-5604 with your map and parcel number and get the figure. It takes one phone call and it affects what you can advertise, what you can build and how often you should pump. Then call (615) 234-9048 if you need the system assessed against it.

Want this looked at properly?

Two steps and we come back with a firm price. Or call (615) 234-9048 — a person answers.

Prefer to talk? Call (615) 234-9048 — a person answers.

Quick answers

What if my house has more bedrooms than the approval?

It matters legally and practically. Tennessee makes it illegal to advertise a home for more bedrooms than its septic is approved for, and the system is being run above its design flow, which shortens its life. Get advice before listing or letting the property.

Can the approved count be increased?

Sometimes, by upgrading the system — but it requires permitting, a site evaluation with soil morphology assessment, and enough suitable area on the parcel. It is a design and permitting exercise, not paperwork.

Does a finished basement room count as a bedroom?

For septic sizing purposes what matters is the approved count on the permit, not what you call the rooms. Adding sleeping space beyond the approval loads a system that was not designed for it.

Bottom line: get the tank opened and looked at.

Call (615) 234-9048 for a price, or use the estimator first.

Call (615) 234-9048 — a person answers